Drainage construction Revo method

Achieve safe and economical construction speed-up and space-saving!

This is a method for constructing a vertical shaft using a circular casing tube without the use of sheet pile supports or liner plates, utilizing a Revo shaft sinking machine. In the Revo method, reaction forces are taken from the main body and counterweight, and a split-type casing tube is driven in by hydraulic jacks, followed by excavation using a clamshell or similar equipment. 【Features】 - The equipment is compact, requiring a small footprint. Additionally, with a main body weight of 3.4 tons, it can be transported by a 4-ton truck. - Even in urban construction, it is less affected by nearby structures and obstacles compared to conventional methods, allowing for efficient work with the use of cover plates. - By advancing the driving process, it avoids pre-excavation and minimizes occurrences of boiling and other issues. The casing driving and extraction are performed using hydraulic jacks, enabling vibration-free and low-noise operations. - The small size of the vertical shaft allows for speedy construction and lower costs. *For more details, please contact us or download the catalog.*

  • Covering plate

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sewer construction - Revo method

Drainage construction Revo method

This is a method for constructing a vertical shaft using a circular casing tube without the use of sheet pile supports or liner plates, utilizing a revocable shaft machine. 【Features】 ○ The equipment is compact, requiring a small footprint. Additionally, with a body weight of 3.4 tons, it can be transported by a 4-ton truck. ○ Even in urban construction, it is less affected by nearby structures and obstacles compared to conventional methods, allowing for efficient work progress through the use of cover plates and other materials. ● For other functions and details, please contact us.

  • Covering plate
  • Other civil engineering works
  • Piles, caissons, sheet piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drainage construction Revo II method

Drainage construction Revo II method

The method of constructing a shaft easily and at low cost using the Rev II shaft machine, which is a further miniaturized version of the Rev shaft machine. 【Features】 ○ The Rev shaft machine has been further miniaturized, reducing its width to 1.7m and weight to 1.46t, and achieving a split-type design (upper part: 0.74t, lower part: 0.72t), allowing for the transportation and installation/removal of the machine using a 2t crane truck (lifting capacity of 2t). ○ With easier installation and removal, casing recovery has become possible. This allows the casing costs, which accounted for a large portion of construction expenses, to be recorded as a loss, enabling further cost reductions. ● For other functions and details, please contact us.

  • Other civil engineering works
  • Crane and others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration